MBB vehicle

type MBB vehicles

speed 4

weight 3000

cells usage 100

The establishment of a new city is a very complicated process. The site must be secured and prepared, resources need to be located and prepped for extraction, basic wiring and piping has to be installed and finally, basic infrastructure may be constructed. Initially this task was performed by a fleet of highly specialized units, however it was discovered that greater efficiency could be obtained by installing all of the necessary equipment on to one mammoth vehicle and so the MBB was developed.

Support units are permanently assigned to the city of their manufacture and may not be transferred.

required buildings

Command Center at level 20
Science Academy at level 1
Engineering Facility at level 1

required researches

MBB vehicle at level 1

base research cost

5000050000300004:26:40

base production cost

5000036000280000:50:00